Wednesday, April 10, 2013

Bathroom Reno - Week 2

After that first day of bathroom renovations, things have been considerably quieter. The horrible war-zone noise of hammers (accompanied by frenzied parrot screeches) wasn't repeated after that first day. The bathroom was stripped pretty much bare in that one day - and after that the noise was construction, not destruction. Laka and George were considerably better behaved from that point on.


We hired a 2-square-meter bin from Kalorama Bins and y'day loaded it with all the rubbish from the job so far. Everything fit except one long pipe (seen on the ground behind the bin above). The bin will be taken out today.

Trevor finished hanging the tiles and did the grouting yesterday. They still have to be wiped down which Trevor said he'd take care of  (and I'm glad, as it looks like a lot of work to me...) - but other than that, we're all ready.  Here's the view facing the bathroom window: 

And here's the view from the window toward the closet.


The tiles look dark in this photo. In real life, they aren't - they look like light-coloured sandstone - very soft and natural effect, and goes extremely well with the white walls above them.

The vanity, toilet, and custom-made shower enclosure are on the way. Trevor expects they'll arrive a week from today.



No comments:

Post a Comment